Project Description
Elystan Street, Chelsea
From the outset, Elystan Street was identified as a logistically challenging project as the whole site was encapsulated in the works. The brief was to construct a triple storey basement structure involving piling, excavation works, temporary works installation, in-situ concrete walls and slabs. Fit-out included a media room, wine cellar and swimming pool, with the entire building envelope being clad in natural stone.