Project Description

Teddington Studios, Teddington

Project

Project Installation of new steel frame extension with profiled metal deck
Client: Haymarket Publishing Limited
Value: Undisclosed

Forcia was tasked with developing the studio buildings of Haymarket Publishing on the banks of the River Thames in Teddington. The project involved the creation of two new steel and concrete floors within an existing warehouse, including the fabrication and installation of 120 tonnes of steel frame, floors made of profiled metal steel sheet decking, steel reinforcement and in-situ concrete.